Backed byEnterprise-grade delivery governance for engineering teams
Use cases / Engineering leaders

See delivery risk. Act with evidence.

Check approvals, linked work and deployment evidence across your repositories. Route findings to the right people and track delivery metrics. Merge blocking stays off until you require the check.

Four weeks on one to three repositories. Success metric agreed before the install.

01The situation

More code ships every week, from engineers and agents.

Reviews and CI cover different risks. Written delivery standards can still be difficult to apply consistently as the volume of changes grows.

Standards
Written down, not enforced

CONTRIBUTING, the pull request template, the SOC 2 control list. They need a consistent check beside the change.

Enforcement
GitHub gates on checks and reviewers

A required check still needs to evaluate the linked work, the approval count, and whether the only approval came from a bot.

Cost
Found in the incident review

Breakage reaches customers. Who approved what is rebuilt by hand from chat history.

02Approach

Prevent before it ships. Prove afterwards.

Warestack checks the pull request while reviewers can act, then keeps the observed change record for reporting, audits and incident reviews.

Mark, then act, then block. Rules start informational. Chains escalate to the people who can act. Blocking is a branch protection setting you turn on per repository.

Humans and agents alike. A coding agent’s pull request is held to the same standards as a person’s. Bot approvals never count as human ones.

Nothing new to adopt. The check on GitHub, the live card in Slack, the timeline on the Linear or Jira issue. Reviewers stay where they are.

A rule, as written

Pull requests that change files under db/migrations/ must include a Rollback section describing how to revert.

What Warestack checks
  1. When any changed file path starts with db/migrations/, the pull request body must contain a heading named Rollback followed by at least one sentence.
  2. Evidence: pull_request_files.path and pull_request.body. Returns Not evaluated only when the changed-file list is unavailable.
Interpretation v1 · pinnedEnabled on orbital/control-planeReports only
03Every week, per repository

Four numbers you can hold the team to.

Example delivery metrics, with a rating, trend and the underlying rows for each one.

6.2/day
Deployment frequency
Elite · 186 deploys · 7 repos
3.4h
Lead time
Elite · pull request to production
52m
Review turnaround
Elite · 212 of 241 under 4h
11
Improperly reviewed merges
Poor · of 198 merged

Not a dashboard to visit. Posted to the channel you choose, weekly, with the CSV.

Evidence underneath. Every number opens into its trend, its data and its breakdown by repository.

04Outcomes

Fewer changes reach customers unreviewed. The audit answers exist before anyone asks.

The time saved is the smallest part of the return.

Customers

Caught at the pull request. Scope drift, missing approvals and untested changes are flagged at the change, with the evidence reviewers need to decide what happens next.

SOC 2 Type II

Evidence before the auditor asks. Approver, checks, tests and linked work item on record for observed production changes. Confirm the retention your audit needs before choosing a plan.

Time

Spend less time rebuilding a change history. Reviews, checks and deployments are recorded together, ready to query and share.

Not a code reviewerWarestack checks how a change was delivered, not what the code says. It does not review code, run your CI or orchestrate coding agents. People and agents are held to the same standards at the same point, the pull request.
05The pilot

Four weeks on one to three repositories.

Paid, with the success metric agreed before anything is installed. Nothing blocks a merge during the pilot unless you decide it should.

From you. A GitHub organization admin for the install, five minutes. A Slack channel. The standards document you already have.

01
Install and observe
The app on the pilot repositories. Rules from the catalog plus two of yours, reporting only. The baseline is recorded.
Week 1
02
Chains on
Live cards in Slack, the timeline on Linear or Jira, escalation to named owners. Rules tuned against real pull requests.
Weeks 2 to 3
03
Review the evidence
The metric against the baseline, from the reports. Decide which rules become required checks, on which repositories.
Week 4

Choose a target before the pilot, such as fewer improperly reviewed merges or a shorter time to first review. Compare the result with the recorded baseline.

© 2026 Warestack Inc.