Backed byEnterprise-grade delivery governance for engineering teams
Use cases / Platform and DevEx teams

One standard across your repositories. Checked for people and agents alike.

Turn standards from CONTRIBUTING, agent instructions and pull request templates into rules your team can review. Apply them to the teams, repositories and paths where they belong, then route findings with chains.

Rules report first. Preview a chain with a dry run before enabling its actions.

01The situation

Hooks and linters stop at commit. Rulesets gate on checks and reviewers.

The pull request brings the work item, approvals and checks together. Evaluate that context consistently so the platform team can focus on exceptions instead of repeating the same manual checks.

Where standards live
In files agents treat as advice

Instruction files shape what an agent writes. They do not check what it opened as a pull request.

Where enforcement stops
At commit, or at the reviewer

Lint and tests see the code. Warestack checks the surrounding process: approvals, scope, the plan artifact, the rollback note.

Where it lands
On the platform team

Recurring exceptions create more follow-up work. A shared rule gives the next reviewer a consistent check.

02Rollout

One rule, every repository.

Enable a rule on a team, a repository or a path. New repositories join as they arrive. Rules report first; merge blocking stays off until you require the check in branch protection.

Scoped where it applies. The migration rule runs only where migrations live. The plan-artifact rule only on terraform-modules.

Exceptions become rules. When the same thread comes back, write the standard as a sentence and let Warestack derive the check. Review it before adopting.

Pass rate per rule, per repository. Which standards hold, which drift, and where. Exceptions trend down, or the rule gets rewritten.

Require migration rollback notesorbital · 12 repositories
control-plane
console-web
collector-agent
billing-service
sdk-go
terraform-modules
docs
auth-service
ingest
mobile
design-system
cli
Merge blocking Off · check not required · 0 enabled
03Rules platform teams write first

The standards that come back every week.

Each written as a sentence, derived into checks, scoped to the repositories where it applies.

Require migration rollback notes

For pull requests that change files under db/migrations/, the description must include a Rollback section describing how to revert.

Custom · control-plane
Infra changes need a plan artifact

For pull requests in terraform-modules, require a terraform plan output linked in the description or attached as a CI artifact.

Custom · terraform-modules
Pull request description format

Summary, Testing, Risk and Rollback sections present and non-empty, so reviewers can assess the change and its deployment safety.

Custom · all repositories
Require successful release jobs

Flags release workflows when an observed required job does not complete successfully.

Catalog rule
Route review requests by file path

Routes review requests to the owning team based on configurable paths.

Catalog rule
Require approvals by branch prefix

Marks pull requests that reach merge with fewer human approvals than their branch prefix requires. Bot approvals never count.

Catalog rule
04Outcomes

Standards hold without the platform team as the manual gate.

The audit answers exist before anyone asks. The time saved is the smallest part of the return.

Customers

Standards hold at the pull request. Scope drift, missing approvals and untested changes are flagged with evidence, so reviewers can focus on the exceptions.

Per rule, per repository

Pass rate. Which standards hold, which drift, and in which repositories. The weekly report names them.

Chains

Keep a pull request’s Slack card current and send review reminders on the schedule you choose. Preview the recipients and actions before enabling a chain.

Not a code reviewerWarestack checks how a change was delivered, not what the code says. It does not review code, run your CI or orchestrate coding agents. People and agents are held to the same standards at the same point, the pull request.
05The pilot

Four weeks on one to three repositories.

Paid, with the success metric agreed before anything is installed. Nothing blocks a merge during the pilot unless you decide it should.

From you. A GitHub organization admin for the install, five minutes. A Slack channel. The repository files and templates where the standards already live.

01
Install and observe
The app on the pilot repositories. Rules from the catalog plus two of yours, reporting only. The baseline is recorded.
Week 1
02
Chains on
Live cards in Slack, the timeline on Linear or Jira, escalation to named owners. Rules tuned against real pull requests.
Weeks 2 to 3
03
Review the evidence
The metric against the baseline, from the reports. Decide which rules become required checks, on which repositories.
Week 4

Success metric: every pull request on the pilot repositories evaluated against the written standards, with exceptions per week down by half by week four.

© 2026 Warestack Inc.